0
(0)

In order to ensure the highest degree of safety during fully automated underground operations, platforms will be operated from the tracks with a glass wall and automatic doors.

It is currently undecided what the new trains will look like. There will continue to be a driver’s cab as the trains will also be used, as required, on sections of Vienna’s underground network that have not yet been converted.

Advert

“Skalar-Chembuster Masterclass Online-Workshop”

The people covering the platform walls, which will be integrated into all furnishings and information elements, will have a new design.

An added benefit here is that damaged panels can be replaced without any troubles.

U5 Station-Design, neue Formen U5 Station-Design, neue Formen U5 Station-Design, neue Formen U5 Station-Design, neue Formen

The design of the new line U5
yf + franz zt

Bewertung: Ø 0 / 5. Anzahl Stimmen: 0

Bisher keine Bewertungen! Sei der Erste, der diesen Beitrag bewertet.